OWPL Windfarm grid connection is a planned grid connection in Scotland, United Kingdom, with 2,250 MW of capacity, held by Offshore Wind Power Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationScotland (connection site: Banniskirk 400kV Substation)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (Scoping)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
HolderOffshore Wind Power LimitedNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Attached toOWPL WindfarmNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Capacity2,250 MWNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyWind OffshoreNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Transmission plcNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date31 Dec 2030 (stage 2, cumulative 2,250 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date31 Dec 2029 (stage 1, cumulative 750 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

OWPL Windfarm grid connection is the 2nd-largest of 1,192 grid connections in Scotland and the 18th-largest of 3,903 in the United Kingdom by capacity; its 2,250 MW is 0.5% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland2nd of 1,19288,894 MW2.5%
United Kingdom18th of 3,903446,745 MW0.5%
All grid connections in our data27th of 7,6161,281,251 MW0.18%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Stage 1 due to connect, 750 MW in total
  2. Stage 2 due to connect, 2,250 MW in total

Holder, grid operator and place