Grid connection · Scotland, United Kingdom

Marram Wind Offshore Wind Farm grid connection

Marram Wind Offshore Wind Farm grid connection is a planned grid connection in Scotland, United Kingdom, with 3,000 MW of capacity, held by Marramwind Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationScotland (connects at Longside 400kV Substation)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (scoping)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
HolderMarramwind LimitedNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Attached toMarram Wind Offshore Wind FarmNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Capacity3,000 MWNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyWind OffshoreNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Transmission plcNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date31 Oct 2031 (stage 1, cumulative 1,000 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date31 Oct 2033 (stage 2, cumulative 3,000 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

Marram Wind Offshore Wind Farm grid connection is the largest of 1,192 grid connections in Scotland and the 10th-largest of 3,903 in the United Kingdom by capacity; its 3,000 MW is 0.67% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland1st of 1,19288,894 MW3.4%
United Kingdom10th of 3,903446,745 MW0.67%
All grid connections in our data11th of 7,9281,372,494 MW0.22%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Stage 1 due to connect, 1,000 MW in total
  2. Stage 2 due to connect, 3,000 MW in total