Battery - 25MW grid connection is a planned grid connection in Scotland, United Kingdom, with 25 MW of capacity, held by The Greenspan Agency.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceBATTERY - 25MW grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Stornoway Grid)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderThe Greenspan AgencySSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toStornoway GSP (via a primary substation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity25 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyBattery storageSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date17 Dec 2021SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date31 Oct 2030 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates58.2096, -6.3840SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

Battery - 25MW grid connection is the 491st-largest of 1,192 grid connections in Scotland and the 1,482nd-largest of 3,903 in the United Kingdom by capacity; its 25 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland491st of 1,19288,894 MW<0.1%
United Kingdom1,482nd of 3,903446,745 MW<0.1%
All grid connections in our data5,039th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 18 power plants (5 operating, 30.9 MW) and 11 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Battery Point, Newton Street - Battery Energy Storage ParkPower plant25 MWPermitted0.8 km
Battery Point PrimarySubstation——0.9 km
Lewis Wind Farm (Barvas Moor)Power plant652 MWCancelled1.3 km
Stornoway Wind Farm (second resubmission)Power plant196 MWPermitted1.3 km
Stornoway GSPSubstation——2.4 km
Coll PrimarySubstation——8.8 km