Caledonia Offshore Wind Farm grid connection is a planned grid connection in Scotland, United Kingdom, with 2,000 MW of capacity, held by Caledonia Offshore Wind Farm Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationScotland (connects at Greens 400kV Substation)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (scoping)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
HolderCaledonia Offshore Wind Farm LimitedNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Attached toCaledonia Offshore Wind FarmNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Capacity2,000 MWNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyWind OffshoreNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Transmission plcNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date31 Oct 2032 (stage 2, cumulative 2,000 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date31 Mar 2031 (stage 1, cumulative 600 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Caledonia Offshore Wind Farm grid connection is the 3rd-largest of 1,192 grid connections in Scotland and the 21st-largest of 3,903 in the United Kingdom by capacity; its 2,000 MW is 0.45% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland3rd of 1,19288,894 MW2.2%
United Kingdom21st of 3,903446,745 MW0.45%
All grid connections in our data33rd of 7,6161,281,251 MW0.16%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Stage 1 due to connect, 600 MW in total
  2. Stage 2 due to connect, 2,000 MW in total