Grid connection · Scotland, United Kingdom

Coldstream Solar PV Plant (Elwartlaw Farm) grid connection

Coldstream Solar PV Plant (Elwartlaw Farm) grid connection is a planned grid connection in Scotland, United Kingdom, with 40.6 MW of capacity, held by Conrad Energy Developments II Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationScotland (connection site: Eccles)SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (Accepted to Connect)SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
HolderConrad Energy Developments II LimitedSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity40.6 MWSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologySolarSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSP Distribution plcSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date30 Nov 2022SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date31 Jul 2031 (target energisation)SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Coldstream Solar PV Plant (Elwartlaw Farm) grid connection is the 346th-largest of 1,192 grid connections in Scotland and the 1,135th-largest of 3,903 in the United Kingdom by capacity; its 40.6 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland346th of 1,19288,894 MW<0.1%
United Kingdom1,135th of 3,903446,745 MW<0.1%
All grid connections in our data4,287th of 7,6161,281,251 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Holder, grid operator and place

More from Conrad Energy Developments II Limited

Other grid connections in Scotland

All 1192 grid connections in Scotland, United Kingdom