Power plant · Scottish Borders, Scotland, United Kingdom
Eccles Battery Energy Storage System
Eccles Battery Energy Storage System is a power plant under construction in Scottish Borders, Scotland, United Kingdom, with 400 MW of capacity, operated by Zenobe Energy.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Scottish Borders (coordinates), Scotland | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | W/O Eccles Substation, Coldstream, TD12 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Under construction | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 11 Aug 2023 (permit ECU00004601, Electricity Act 1989 section 36, issued by Scottish Government (S36)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 14 Sept 2022 (reference ECU00004601, planning authority Scottish Government (S36)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 11 Aug 2023 (granted, reference ECU00004601, planning authority Scottish Government (S36)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Zenobe Energy | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 400 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 55.6701, -2.3201 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Construction started
- Permit granted (planning authority Scottish Government (S36), reference ECU00004601)
- Permit applied for (planning authority Scottish Government (S36), reference ECU00004601)
How it compares
Eccles Battery Energy Storage System is the 48th-largest of 872 power plants planned, permitted or under construction in Scotland and the 157th-largest of 3,222 in the United Kingdom by capacity; its 400 MW is 0.13% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 48th of 872 | 99,272 MW | 0.4% |
| United Kingdom | 157th of 3,222 | 300,461 MW | 0.13% |
| All power plants planned, permitted or under construction in our data | 351st of 6,455 | 664,040 MW | <0.1% |
Nearby
Within 50 km of this power plant: 4 grid connections (3 operating, 77.5 MW), 1 data center and 1 substation, measured from the coordinates in the facts above. The table shows the nearest 5, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Battery storage and Gas 2.8 MW grid connection at Denwick | Grid connection | 2.8 MW | Planned | 33 km |
| Solar 2.845 MW grid connection at Denwick | Grid connection | 2.85 MW | Operating | 33 km |
| Wind 20.5 MW grid connection at Wandylaw Windfarm | Grid connection | 20.5 MW | Operating | 39 km |
| RBS Data Centre | Data center | — | — | 47 km |
| Denwick | Substation | — | — | 48 km |
Operator and place
More from Zenobe Energy
- Low Harker Farm, Low Harker - Battery Storage Facility400 MW · permitted
- Kilmarnock South Substation - Battery storage300 MW
- Blackhillock Electricity Substation - Battery Energy Storage System300 MW · under construction
- Carlisle Road - Battery Energy Storage System200 MW · permitted
- Printworks Road - Stalybridge Battery Storage150 MW · permitted
- National Grid Electricity Substation, Capenhurst Lane - Battery Storage100 MW
- Shetland Battery Energy Storage System70 MW · under construction
- Wishaw Battery Storage Facility50 MW
Other power plants in Scotland
- Seagreen1,075 MW
- Moray East950 MW
- Moray West Offshore Wind Farm Project882 MW
- Lewis Wind Farm (Barvas Moor)652 MW
- Beatrice588 MW
- Neart na Gaoithe450 MW
- Viking Wind Farm443 MW
- Cruachan440 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.