Eccles Battery Energy Storage System is a power plant under construction in Scottish Borders, Scotland, United Kingdom, with 400 MW of capacity, operated by Zenobe Energy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationScottish Borders (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressW/O Eccles Substation, Coldstream, TD12DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusUnder constructionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date11 Aug 2023 (permit ECU00004601, Electricity Act 1989 section 36, issued by Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date14 Sept 2022 (reference ECU00004601, planning authority Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date11 Aug 2023 (granted, reference ECU00004601, planning authority Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorZenobe EnergyDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity400 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates55.6701, -2.3201DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Construction started
  2. Permit granted (planning authority Scottish Government (S36), reference ECU00004601)
  3. Permit applied for (planning authority Scottish Government (S36), reference ECU00004601)

How it compares

Eccles Battery Energy Storage System is the 48th-largest of 872 power plants planned, permitted or under construction in Scotland and the 157th-largest of 3,222 in the United Kingdom by capacity; its 400 MW is 0.13% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Scotland48th of 87299,272 MW0.4%
United Kingdom157th of 3,222300,461 MW0.13%
All power plants planned, permitted or under construction in our data351st of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 4 grid connections (3 operating, 77.5 MW), 1 data center and 1 substation, measured from the coordinates in the facts above. The table shows the nearest 5, up to 3 per kind.

NameKindSizeStatusDistance
Battery storage and Gas 2.8 MW grid connection at DenwickGrid connection2.8 MWPlanned33 km
Solar 2.845 MW grid connection at DenwickGrid connection2.85 MWOperating33 km
Wind 20.5 MW grid connection at Wandylaw WindfarmGrid connection20.5 MWOperating39 km
RBS Data CentreData center——47 km
DenwickSubstation——48 km

Operator and place

More from Zenobe Energy

Other power plants in Scotland

All 2093 power plants in Scotland, United Kingdom

Data on this page