Land 1A Priory Stables grid connection

Land 1A Priory Stables grid connection is a planned grid connection in England, United Kingdom, with 18 MW of capacity, held by Conrad Energy Developments II Limited.

Map: where Land 1A Priory Stables grid connection lies
51.3899, -0.4703 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Chertsey 11kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderConrad Energy Developments II LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toChertsey 11kV (via a primary substation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity18 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologyGasUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorSouth Eastern Power Networks plc (UK Power Networks, South East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date3 Oct 2022UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date10 Jan 2026 (target energisation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.3899, -0.4703UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

Land 1A Priory Stables grid connection is the 1,475th-largest of 3,539 grid connections in England and the 2,112th-largest of 4,870 in the United Kingdom by capacity; its 18 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,475th of 3,539341,715 MW<0.1%
United Kingdom2,112th of 4,870467,981 MW<0.1%
All grid connections in our data5,642nd of 8,6181,355,288 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Was due to connect; the register does not list it as connected

Nearby

Within 50 km of this grid connection: 557 substations, 299 power plants (102 operating, 1,652 MW), 154 data centers (1 operating, 88 MW) and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Weybridge 11kVSubstation——2.0 km
Charlton Lane Eco Park (ACT)Power plant3.6 MWUnder construction2.8 km
Charlton Lane Eco Park (Waste AD)Power plant1.7 MWOperating2.8 km
Twynersh Meadows, Thorpe Road - Solar Park & Battery StoragePower plant5.5 MWPlanned3.0 km
Laleham GSPSubstation——3.9 km
Walton 11kVSubstation——4.2 km
Redcentric ByfleetData center——4.8 km
Serverfarm LON1 – London Data CenterData center——6.4 km
Ark Data Centres - Longcross ParkData center——8.7 km

Holder, grid operator and place

More from Conrad Energy Developments II Limited

Other grid connections in England

All 4837 grid connections in England, United Kingdom