Power plant · Scottish Borders, Scotland, United Kingdom

Eccles II Substation - Battery Energy Storage System

Eccles II Substation - Battery Energy Storage System is a battery storage plant under construction in Scottish Borders, Scotland, United Kingdom, with 500 MW of capacity, operated by Matrix Renewables.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationScottish Borders (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressW/O Eccles Substation, approximately 2.3 km S/O Leitholm, TD12 4JADESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusUnder constructionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date16 Dec 2024 (permit ECU00004804, Electricity Act 1989 section 36, issued by Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date2 May 2023 (reference ECU00004804, planning authority Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date16 Dec 2024 (granted, reference ECU00004804, planning authority Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorMatrix RenewablesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity500 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates55.6735, -2.3233DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Construction started
  2. Permit granted (planning authority Scottish Government (S36), reference ECU00004804)
  3. Permit applied for (planning authority Scottish Government (S36), reference ECU00004804)

How it compares

Eccles II Substation - Battery Energy Storage System is the 34th-largest of 742 power plants planned, permitted or under construction in Scotland and the 106th-largest of 2,548 in the United Kingdom by capacity; its 500 MW is 0.18% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Scotland34th of 74293,216 MW0.54%
United Kingdom106th of 2,548279,068 MW0.18%
All power plants planned, permitted or under construction in our data257th of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 4 grid connections (3 operating, 77.5 MW), 1 data center and 1 substation, measured from the coordinates in the facts above. The table shows the nearest 5, up to 3 per kind.

NameKindSizeStatusDistance
Battery storage and Gas 2.8 MW grid connection at DenwickGrid connection2.8 MWPlanned34 km
Solar 2.845 MW grid connection at DenwickGrid connection2.85 MWOperating34 km
Wind 20.5 MW grid connection at Wandylaw WindfarmGrid connection20.5 MWOperating39 km
RBS Data CentreData center——47 km
DenwickSubstation——49 km

Operator and place

More from Matrix Renewables

Other power plants in Scotland

All 2105 power plants in Scotland, United Kingdom