Grid connection · Scotland, United Kingdom

Balgonie Farm 50MW Battery grid connection

Balgonie Farm 50MW Battery grid connection is a planned grid connection in Scotland, United Kingdom, with 52.7 MW of capacity, held by Opde UK Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceBALGONIE FARM 50MW BATTERY grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Abernethy Grid)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderOpde UK LtdSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toAbernethy Primary (via a primary substation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity52.7 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyBattery storageSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date8 Oct 2025SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date31 Oct 2028 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates56.3402, -3.3056SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Balgonie Farm 50MW Battery grid connection is the 187th-largest of 1,192 grid connections in Scotland and the 758th-largest of 3,903 in the United Kingdom by capacity; its 52.7 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland187th of 1,19288,894 MW<0.1%
United Kingdom758th of 3,903446,745 MW<0.1%
All grid connections in our data3,719th of 7,6161,281,251 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 312 power plants (69 operating, 1,055 MW) and 64 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Newburgh Road, Abernethy - Battery Energy Storage FacilityPower plant49.9 MWPermitted0.5 km
Abernethy PrimarySubstation——0.7 km
Abernethy GSPSubstation——0.7 km
Jamesfield Garden Centre, Newburgh - Battery Energy StoragePower plant49.9 MWPlanned0.7 km
Newburgh Road, Abernethy - Energy StoragePower plant15 MWPermitted1.1 km
Bridge of Earn PrimarySubstation——6.1 km

Holder, grid operator and place

More from Opde UK Ltd

Other grid connections in Scotland

All 1192 grid connections in Scotland, United Kingdom