Grid connection · Scotland, United Kingdom

Morenish grid connection

Morenish grid connection is a planned grid connection in Scotland, United Kingdom, with 49.4 MW of capacity, held by Opde UK Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceMORENISH grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Killin Grid)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderOpde UK LtdSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toKillin GSP (via a primary substation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity49.4 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyBattery storageSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date8 Oct 2025SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date30 Mar 2029 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates56.4805, -4.3013SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

Morenish grid connection is the 302nd-largest of 1,192 grid connections in Scotland and the 1,019th-largest of 3,903 in the United Kingdom by capacity; its 49.4 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland302nd of 1,19288,894 MW<0.1%
United Kingdom1,019th of 3,903446,745 MW<0.1%
All grid connections in our data4,396th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 104 power plants (43 operating, 580 MW) and 43 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Tir Artair - Battery Energy Storage FacilityPower plant49.9 MWPermitted0.7 km
Killin Switching Station, Boreland - Boreland Energy Storage ParkPower plant43 MWPermitted1.7 km
Killin GSPSubstation——1.8 km
Killin Town PrimarySubstation——2.3 km
Acharn Forest Killin Biomass PlantPower plant5.6 MWOperating3.4 km
Ardchyle PrimarySubstation——7.6 km