Grid connection · Scotland, United Kingdom

Blindwells Farm grid connection

Blindwells Farm grid connection is a planned grid connection in Scotland, United Kingdom, with 52.7 MW of capacity, held by Opde UK Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceBLINDWELLS FARM grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Arbroath Grid)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderOpde UK LtdSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toBindwells Battery Storage Facility (matched by coordinates+technology+capacity+company, 1.45 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Attached toArbroath GSP (via a primary substation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity52.7 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyBattery storageSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date8 Aug 2022SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date30 Jun 2032 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates56.5646, -2.6526SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

Blindwells Farm grid connection is the 187th-largest of 1,192 grid connections in Scotland and the 758th-largest of 3,903 in the United Kingdom by capacity; its 52.7 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland187th of 1,19288,894 MW<0.1%
United Kingdom758th of 3,903446,745 MW<0.1%
All grid connections in our data3,994th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 184 power plants (40 operating, 2,069 MW) and 60 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Bankhead, Arbirlot - Battery Energy StoragePower plant49.9 MWPermitted1.2 km
Bindwells Battery Storage FacilityPower plant49.9 MWPermitted1.5 km
Denfield - Solar FarmPower plant12.5 MWPermitted1.7 km
Arbroath GSPSubstation——2.0 km
Elliot Depot PrimarySubstation——2.6 km
Charles Avenue PrimarySubstation——3.0 km