Power plant · Perth and Kinross, Scotland, United Kingdom

Newburgh Road, Abernethy - Battery Energy Storage Facility

Newburgh Road, Abernethy - Battery Energy Storage Facility is a permitted power plant in Perth and Kinross, Scotland, United Kingdom, with 49.9 MW of capacity, operated by Opdenergy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationPerth and Kinross (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Address200 Metres N/O Pitcurran House, Newburgh Road, Abernethy, PH2 9LHDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date15 May 2025 (permit 24/01386/FLM, Town and Country Planning Act, issued by Perth and Kinross)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date18 Nov 2024 (reference 24/01386/FLM, planning authority Perth and Kinross)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date15 May 2025 (granted, reference 24/01386/FLM, planning authority Perth and Kinross)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorOpdenergyDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity49.9 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates56.3398, -3.2975DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Newburgh Road, Abernethy - Battery Energy Storage Facility is the 320th-largest of 872 power plants planned, permitted or under construction in Scotland and the 886th-largest of 3,222 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Scotland320th of 87299,272 MW<0.1%
United Kingdom886th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data1,966th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 92 grid connections (28 operating, 407 MW), 64 substations and 6 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Abernethy PrimarySubstation——0.2 km
Abernethy GSPSubstation——0.2 km
Balgonie Farm 50MW Battery grid connectionGrid connection52.7 MWPlanned0.5 km
Balgonie Farm BESS 49.9MW grid connectionGrid connection50 MWPlanned0.9 km
Balgonie Farm grid connectionGrid connection120 MWPlanned0.9 km
Bridge of Earn PrimarySubstation——6.6 km
Pulsant Edinburgh SC-1Data center——46 km
Pulsant Edinburgh South Gyle SC-1Data center——46 km
Lloyds Banking Group data center, ScotlandData center——46 km

Operator and place

More from Opdenergy

Other power plants in Scotland

All 2093 power plants in Scotland, United Kingdom

Data on this page