Power plant · Perth and Kinross, Scotland, United Kingdom

Jamesfield Garden Centre, Newburgh - Battery Energy Storage

Jamesfield Garden Centre, Newburgh - Battery Energy Storage is a planned power plant in Perth and Kinross, Scotland, United Kingdom, with 49.9 MW of capacity, operated by Harmony Energy Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationPerth and Kinross (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Address300 Metres Nw/O Jamesfield Garden Centre, Newburgh, Cupar, KY14 6EWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date6 Feb 2026 (reference 26/00067/FLM, planning authority Perth and Kinross)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorHarmony Energy LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity49.9 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates56.3432, -3.2952DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority Perth and Kinross, reference 26/00067/FLM)

How it compares

Jamesfield Garden Centre, Newburgh - Battery Energy Storage is the 320th-largest of 872 power plants planned, permitted or under construction in Scotland and the 886th-largest of 3,222 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Scotland320th of 87299,272 MW<0.1%
United Kingdom886th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data1,966th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 92 grid connections (28 operating, 407 MW), 65 substations and 6 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Abernethy PrimarySubstation——0.4 km
Abernethy GSPSubstation——0.4 km
Balgonie Farm BESS 49.9MW grid connectionGrid connection50 MWPlanned0.5 km
Balgonie Farm grid connectionGrid connection120 MWPlanned0.5 km
Jamesfield Farm Battery Storage 1 grid connectionGrid connection31.6 MWOperating0.5 km
Errol PrimarySubstation——6.4 km
Pulsant Edinburgh SC-1Data center——46 km
Pulsant Edinburgh South Gyle SC-1Data center——46 km
Lloyds Banking Group data center, ScotlandData center——46 km

Operator and place

More from Harmony Energy Limited

Other power plants in Scotland

All 2093 power plants in Scotland, United Kingdom

Data on this page