Power plant · Perth and Kinross, Scotland, United Kingdom

Newburgh Road, Abernethy - Energy Storage

Newburgh Road, Abernethy - Energy Storage is a cancelled battery storage plant in Perth and Kinross, Scotland, United Kingdom, with 15 MW of capacity, operated by Centrica Business Solutions.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationPerth and Kinross (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Address110 Metres Ne/O Abernethy Cemetery, Abernethy Cemetery, Newburgh Road, Abernethy, Perth, PH2DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission granted, permission expired)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date29 Mar 2023 (permit 22/02217/FLL, Town and Country Planning Act, issued by Perth and Kinross)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date13 Jan 2022 (reference 22/02217/FLL, planning authority Perth and Kinross)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date29 Mar 2023 (granted, reference 22/02217/FLL, planning authority Perth and Kinross)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorCentrica Business Solutions (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity15 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates56.3423, -3.2878DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Perth and Kinross, reference 22/02217/FLL)
  2. Permit applied for (planning authority Perth and Kinross, reference 22/02217/FLL)

How it compares

Newburgh Road, Abernethy - Energy Storage is the 599th-largest of 1,340 power plants in Scotland and the 1,839th-largest of 5,834 in the United Kingdom by capacity; its 15 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Scotland599th of 1,34046,467 MW<0.1%
United Kingdom1,839th of 5,834200,500 MW<0.1%
All power plants in our data8,172nd of 15,7991,918,113 MW<0.1%

Nearby

Within 50 km of this power plant: 92 grid connections (28 operating, 407 MW), 66 substations and 6 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Abernethy GSPSubstation——0.5 km
Abernethy PrimarySubstation——0.5 km
Balgonie Farm BESS 49.9MW grid connectionGrid connection50 MWPlanned0.9 km
Balgonie Farm grid connectionGrid connection120 MWPlanned0.9 km
Jamesfield Farm Battery Storage 1 grid connectionGrid connection31.6 MWOperating0.9 km
Errol PrimarySubstation——6.2 km
Pulsant Edinburgh SC-1Data center——46 km
Pulsant Edinburgh South Gyle SC-1Data center——46 km
Lloyds Banking Group data center, ScotlandData center——46 km

Operator and place

More from Centrica Business Solutions

Other power plants in Scotland

All 2105 power plants in Scotland, United Kingdom

Data on this page