Power plant · Redcar and Cleveland, England, United Kingdom
ICI No2 (Teesport) Landfill
ICI No2 (Teesport) Landfill is a power plant in Redcar and Cleveland, England, United Kingdom, with 1 MW of capacity, operated by Highfield Environmental.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Redcar and Cleveland (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | ICI No2 (Teesport) Landfill, 2 Teesport, Landfill Grange Town, South Bank, Middlesbrough, TS6 6UG | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Operating (operational) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Start year | 2021 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 24 Sept 2021 (permit R/2017/0709/FF, Town and Country Planning Act, issued by Redcar and Cleveland) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 9 Oct 2017 (ref. R/2017/0709/FF, Redcar and Cleveland) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 24 Sept 2021 (granted, ref. R/2017/0709/FF, Redcar and Cleveland) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Highfield Environmental | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 1 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Landfill Gas | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 54.5931, -1.1533 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
ICI No2 (Teesport) Landfill is the 3,301st-largest of 3,430 power plants in England and the 4,866th-largest of 5,050 in the United Kingdom by capacity; its 1 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 3,301st of 3,430 | 71,985 MW | <0.1% |
| United Kingdom | 4,866th of 5,050 | 115,642 MW | <0.1% |
| All power plants in our data | 11,790th of 12,008 | 1,173,302 MW | <0.1% |
Timeline
Dated facts about this power plant from its sources, oldest first.
- Started operating
- Permit issued (Town and Country Planning Act), no. R/2017/0709/FF
Nearby
Within 50 km of this power plant: 239 grid connections (123 operating, 1,240 MW) and 127 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Northumbrian Water Ltd grid connection | Grid connection | 13.2 MW | Operating | 1.0 km |
| Tees Valley Energy Recovery grid connection | Grid connection | 5 MW | Planned | 1.1 km |
| Waste 49.9 MW grid connection at Tees Valley Energy | Grid connection | 49.9 MW | Planned | 1.1 km |
| Grangetown | Substation | — | — | 1.3 km |
| Tees Industrial T1 T2 | Substation | — | — | 2.1 km |
| Lackenby | Substation | — | — | 3.1 km |
Operator and place
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.