Power plant · York, England, United Kingdom

Sutton-on-the-Forest, Brownmoor Lane -BESS

Sutton-on-the-Forest, Brownmoor Lane -BESS is a planned power plant in York, England, United Kingdom, with 10 MW of capacity, operated by Ampyr Energy UK Development Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationYork (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressSutton-on-the-Forest, Brownmoor Lane, York, YO32 2RGDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date14 Jul 2025 (reference ZB25/01321/FUL, planning authority York)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorAmpyr Energy UK Development LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity10 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (co-located with re)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.0339, -1.1138DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Sutton-on-the-Forest, Brownmoor Lane -BESS is the 1,441st-largest of 2,174 power plants planned, permitted or under construction in England and the 2,237th-largest of 3,222 in the United Kingdom by capacity; its 10 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,441st of 2,174186,088 MW<0.1%
United Kingdom2,237th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data5,307th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 276 grid connections (136 operating, 1,449 MW), 186 substations, 4 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Battery storage and Solar 59.9 MW grid connection at Low Bohemia BESS DirectGrid connection59.9 MWPlanned0.1 km
Battery storage and Solar 51.87 MW grid connection at Stripe Lane HybridGrid connection51.9 MWPlanned4.9 km
Battery storage and Solar 90.97 MW grid connection at Overton GrangeGrid connection91 MWPlanned4.9 km
Rawcliffe LaneSubstation——6.0 km
Moor Monkton PumpsSubstation——6.1 km
PoppletonSubstation——6.7 km
Yorkshire GREENTransmission line—Permitted18 km
VocaLinkData center——30 km
HSBC Wakefield Data CentreData center——41 km

Operator and place

More from Ampyr Energy UK Development Limited

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page