Data center · England, United Kingdom

VocaLink

VocaLink is a data center in England, United Kingdom.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandOpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Address4 Cardale Park, Harrogate, HG3 1RYOpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Building footprint1,297 m² (building)OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Coordinates53.9758, -1.5690OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026

Research on this data center and its owner.Who owns it up to the parent company, its power supply, grid connection and planning status, and an introduction to the owner.

Request research

Nearby

Within 50 km of this data center: 313 grid connections (160 operating, 1,682 MW), 285 power plants (80 operating, 3,582 MW), 282 substations and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Harrogate WestSubstation——1.4 km
OatlandsSubstation——2.5 km
Wind 15.2 MW grid connection at Knabs RidgeGrid connection15.2 MWOperating2.9 km
Harrogate 132/11kV DirectSubstation——3.0 km
Jenny Field DrivePower plant5 MWPermitted3.5 km
High Boar Wind FarmPower plant8 MWCancelled3.9 km
Wind 30 MW grid connection at Haverigg Wind FarmGrid connection30 MWPlanned4.0 km
Gas 1.425 MW grid connection at StarbeckGrid connection1.43 MWOperating4.1 km
Kellingley Farm, Stocking Lane - Battery Energy StoragePower plant240 MWPlanned4.3 km

Place

Other data centers in England

All 245 data centers in England, United Kingdom

Data on this page