Transmission line · North Somerset, England, United Kingdom

Hinkley Point C Connection

Hinkley Point C Connection is a permitted transmission line in North Somerset, England, United Kingdom, operated by National Grid.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorth Somerset (coordinates), England (region: South West)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
AddressWest Somerset to BristolPlanning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (Post-decision: granted)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date19 Jan 2016 (permit number: EN020001, program: Planning Act 2008 development consent, issuer: Secretary of State)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
Application date28 May 2014 (reference: EN020001, authority: The Planning Inspectorate)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date19 Jan 2016 (outcome: granted, reference: EN020001, authority: The Planning Inspectorate)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorNational Grid (role: applicant)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
Area1,328 ha (application boundary)planning.data.gov.uk · record · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.3341, -2.7740Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this transmission line, or want an introduction to its operator? Ask us.

How it compares by area

Hinkley Point C Connection is the 16th-largest of 22 transmission lines in England and the 18th-largest of 27 in the United Kingdom by area, with 1,328 ha. It reports no undefined, so it is ranked by area among the transmission lines in our data that report one, whatever their status. Areas of shared titles overlap, so they are not added up.

WithinRank
England16th of 22
United Kingdom18th of 27

How its operator compares

National Grid operates 5 of the 31 transmission lines in the United Kingdom in our data with a named owner; 1 owner has more. Counts cover the transmission lines in our data that name an owner, holder or operator; an asset with several owners counts for each.

Operator in United KingdomRankTransmission linesShare
National Grid Electricity Transmission plc1st1239%
National Grid2nd516%
SP Manweb3rd39.7%
Aquind Limited4th13.2%
Green Gen Cymru4th13.2%

Nearby

Within 50 km of this transmission line: 487 power plants (205 operating, 1,620 MW), 397 grid connections (49 operating, 492 MW) and 35 substations, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Kitland Solar FarmPower plant40 MWPermitted2.0 km
Brinsea Green Farm, Brinsea Lane - Solar PhotovoltaicPower plant30 MWPermitted2.5 km
J019B Brinsea II grid connectionGrid connection——2.7 km
Yeowood Farm - Battery Energy StoragePower plant49.9 MWCancelled2.9 km
Congresbury Iwood Lane Solar Park grid connectionGrid connection——3.1 km
Congresbury Stock Lane PV Array grid connectionGrid connection——3.1 km
Holwell PrimarySubstation——30 km
Bruton PrimarySubstation——34 km
Castle Cary PrimarySubstation——34 km

Operator and place

More from National Grid

Other transmission lines in England

All 26 transmission lines in England, United Kingdom

Data on this page