Grid connection · England, United Kingdom

Landmark Farm grid connection

Landmark Farm grid connection is a planned grid connection in England, United Kingdom, with 5.5 MW of capacity, connected by Southern Electric Power Distribution plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceLANDMARK FARM grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at Holwell)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toHolwell Primary (via a primary substation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity5.5 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date21 May 2024SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date23 Jan 2027 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage11 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates51.1779, -2.4078SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its grid operator? Ask us.

How it compares

Landmark Farm grid connection is the 1,631st-largest of 2,533 grid connections in England and the 2,536th-largest of 3,903 in the United Kingdom by capacity; its 5.5 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,631st of 2,533319,370 MW<0.1%
United Kingdom2,536th of 3,903446,745 MW<0.1%
All grid connections in our data6,188th of 7,6161,281,251 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 396 power plants (169 operating, 1,471 MW), 76 substations and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.

NameKindSizeStatusDistance
Landmark Farm, Burts Hill To Nunney Catch Roundabout - Wind TurbinePower plant2 MWPlanned0.2 km
Holwell PrimarySubstation——2.6 km
Holwell HillPower plant6 MWOperating3.0 km
Torr WorksPower plant3.6 MWCancelled3.1 km
Bruton PrimarySubstation——7.4 km
Frome BSPSubstation——9.3 km
Hinkley Point C ConnectionTransmission line—Permitted31 km
Hinkley Point C Connection Project Material ChangeTransmission line—Planned35 km