Transmission line · Dover, England, United Kingdom

Richborough Connection Project

Richborough Connection Project is a permitted transmission line in Dover, England, United Kingdom, operated by National Grid.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationDover (coordinates), England (South East)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
AddressRichborough to CanterburyPlanning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (post-decision, granted)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date3 Aug 2017 (permit EN020017, Planning Act 2008 development consent, issued by Secretary of State)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
Application date14 Jan 2016 (reference EN020017, planning authority The Planning Inspectorate)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date3 Aug 2017 (granted, reference EN020017, planning authority The Planning Inspectorate)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorNational Grid (applicant)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyInterconnectorPlanning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
Voltage400 kVPlanning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
Area1,595 ha (application boundary)planning.data.gov.uk · record · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.3112, 1.2426Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this transmission line, or want an introduction to its operator? Ask us.

How it compares by area

Richborough Connection Project is the 15th-largest of 22 transmission lines in England and the 17th-largest of 27 in the United Kingdom by area, with 1,595 ha. It reports no undefined, so it is ranked by area among the transmission lines in our data that report one, whatever their status. Areas of shared titles overlap, so they are not added up.

WithinRank
England15th of 22
United Kingdom17th of 27

How its operator compares

National Grid operates 5 of the 31 transmission lines in the United Kingdom in our data with a named owner; 1 owner has more. Counts cover the transmission lines in our data that name an owner, holder or operator; an asset with several owners counts for each.

Operator in United KingdomRankTransmission linesShare
National Grid Electricity Transmission plc1st1239%
National Grid2nd516%
SP Manweb3rd39.7%
Aquind Limited4th13.2%
Green Gen Cymru4th13.2%

Nearby

Within 50 km of this transmission line: 154 power plants (58 operating, 2,457 MW) and 4 data centers, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Ash Wind FarmPower plant2 MWCancelled1.7 km
Marley Lane Solar Farm & Battery StoragePower plant49.9 MWCancelled4.3 km
Grain Harvesters LtdPower plant1 MWOperating5.0 km
The Bunker - South East Data CentreData center——5.8 km
Sota DatacentreData center——36 km
CustodianDC MaidstoneData center——48 km

Operator and place

More from National Grid

Other transmission lines in England

All 26 transmission lines in England, United Kingdom

Data on this page