Transmission line · East Riding of Yorkshire, England, United Kingdom
Continental Link Multi-Purpose Interconnector
Continental Link Multi-Purpose Interconnector is a cancelled transmission line in East Riding of Yorkshire, England, United Kingdom, operated by National Grid Ventures.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | East Riding of Yorkshire (coordinates), England (region: Yorkshire and the Humber) | Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | From UK seaward limit in the North Sea to a landfall along the Holderness Coast, with grid connection | Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Cancelled (Withdrawn) | Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 29 Jan 2025 (outcome: withdrawn, reference: EN020025, authority: The Planning Inspectorate) | Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | National Grid Ventures (role: applicant) | Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Interconnector | Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 53.8014, -0.4150 | Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this transmission line, or want an introduction to its operator? Ask us.
Nearby
Within 50 km of this transmission line: 324 power plants (80 operating, 3,654 MW), 291 grid connections (144 operating, 2,305 MW), 134 substations and 1 CO2 emitter, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Creyke Beck | Substation | — | — | 0.1 km |
| Pillswood Phase 2 | Power plant | 49.5 MW | Operating | 0.2 km |
| Pillswood Phase 1 | Power plant | 49.5 MW | Operating | 0.2 km |
| Battery storage 49.9 MW grid connection at Burn Park Farm Direct | Grid connection | 49.9 MW | Operating | 0.3 km |
| Gas 49.9 MW grid connection at Burn Park Farm Direct | Grid connection | 49.9 MW | Operating | 0.3 km |
| Creyke Beck | Power plant | 49.9 MW | Operating | 0.3 km |
| Pillswood Farm grid connection | Grid connection | 49.9 MW | Operating | 0.7 km |
| Beverley 132/33kV | Substation | — | — | 2.2 km |
| Southwood Road | Substation | — | — | 2.9 km |
Operator and place
Other transmission lines in England
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.