Transmission line · East Riding of Yorkshire, England, United Kingdom

Continental Link Multi-Purpose Interconnector

Continental Link Multi-Purpose Interconnector is a cancelled transmission line in East Riding of Yorkshire, England, United Kingdom, operated by National Grid Ventures.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEast Riding of Yorkshire (coordinates), England (region: Yorkshire and the Humber)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
AddressFrom UK seaward limit in the North Sea to a landfall along the Holderness Coast, with grid connectionPlanning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (Withdrawn)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date29 Jan 2025 (outcome: withdrawn, reference: EN020025, authority: The Planning Inspectorate)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorNational Grid Ventures (role: applicant)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyInterconnectorPlanning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.8014, -0.4150Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this transmission line, or want an introduction to its operator? Ask us.

Nearby

Within 50 km of this transmission line: 324 power plants (80 operating, 3,654 MW), 291 grid connections (144 operating, 2,305 MW), 134 substations and 1 CO2 emitter, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Creyke BeckSubstation——0.1 km
Pillswood Phase 2Power plant49.5 MWOperating0.2 km
Pillswood Phase 1Power plant49.5 MWOperating0.2 km
Battery storage 49.9 MW grid connection at Burn Park Farm DirectGrid connection49.9 MWOperating0.3 km
Gas 49.9 MW grid connection at Burn Park Farm DirectGrid connection49.9 MWOperating0.3 km
Creyke BeckPower plant49.9 MWOperating0.3 km
Pillswood Farm grid connectionGrid connection49.9 MWOperating0.7 km
Beverley 132/33kVSubstation——2.2 km
Southwood RoadSubstation——2.9 km