Power plant · Somerset, England, United Kingdom

Hinkley Point C New Nuclear Power Station

Hinkley Point C New Nuclear Power Station is a permitted power plant in Somerset, England, United Kingdom, with 3,260 MW of capacity, operated by NNB Generation Company Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationSomerset (coordinates), England (South West)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
AddressHinkley Point SomersetPlanning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (post-decision, granted)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date19 Mar 2013 (permit EN010001, Planning Act 2008 development consent, issued by Secretary of State)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
Application date31 Oct 2011 (reference EN010001, planning authority The Planning Inspectorate)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date19 Mar 2013 (granted, reference EN010001, planning authority The Planning Inspectorate)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorNNB Generation Company Limited (applicant)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity3,260 MW (description)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyNuclearPlanning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.2081, -3.1292Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority The Planning Inspectorate, reference EN010001) · source
  2. Permit applied for (planning authority The Planning Inspectorate, reference EN010001) · source

How it compares

Hinkley Point C New Nuclear Power Station is the largest of 2,174 power plants planned, permitted or under construction in England and the 3rd-largest of 3,222 in the United Kingdom by capacity; its 3,260 MW is 1.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1st of 2,174185,888 MW1.8%
United Kingdom3rd of 3,222300,461 MW1.1%
All power plants planned, permitted or under construction in our data7th of 6,455664,040 MW0.49%

Nearby

Within 50 km of this power plant: 15 grid connections (9 operating, 98.9 MW), 9 substations, 8 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Tata Communications Highbridge DatacentreData center——12 km
Insight Data LtdData center——23 km
Hinkley Point C Connection Project Material ChangeTransmission line—Planned25 km
Hinkley Point C ConnectionTransmission line—Permitted28 km
Microsoft Newport data centreData center——39 km
Fleet Air Arm Museum grid connectionGrid connection4.01 MWOperating40 km
Southfield Farm Solar Park grid connectionGrid connection7.6 MWOperating42 km
Larkhill PrimarySubstation——44 km
Chiltern Cantello grid connectionGrid connection4.75 MWOperating44 km

Operator and place

More from NNB Generation Company Limited

Other power plants in England

All 5809 power plants in England, United Kingdom