Grid connection · Scotland, United Kingdom
Wellbank grid connection
Wellbank grid connection is a planned grid connection in Scotland, United Kingdom, with 25 MW of capacity, held by Greentech Projects Holding UK Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Name in the source | WELLBANK grid connection | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Location | Scotland (connects at Milton of Craigie Grid) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Status | Planned (accepted to connect) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Holder | Greentech Projects Holding UK Limited | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Attached to | Wellbank - Solar Farm (matched by name+coordinates+technology+capacity+company, 0.63 km away) | Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026 |
| Attached to | Milton of Craigie Primary (via a primary substation) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Capacity | 25 MW | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Technology | Solar | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | Scottish Hydro Electric Power Distribution plc | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Queue date | 26 Aug 2025 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Connection date | 26 Aug 2030 (target energisation) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 33 kV | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Coordinates | 56.5259, -2.8698 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
Know more about this grid connection, or want an introduction to its holder? Ask us.
How it compares
Wellbank grid connection is the 491st-largest of 1,192 grid connections in Scotland and the 1,482nd-largest of 3,903 in the United Kingdom by capacity; its 25 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 491st of 1,192 | 88,894 MW | <0.1% |
| United Kingdom | 1,482nd of 3,903 | 446,745 MW | <0.1% |
| All grid connections in our data | 4,757th of 7,616 | 1,281,251 MW | <0.1% |
Timeline
Dated facts about this grid connection from its sources, oldest first.
- Entered the connection queue
- Due to connect
Nearby
Within 50 km of this grid connection: 215 power plants (45 operating, 1,025 MW) and 68 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Wellbank - Solar Farm | Power plant | 25 MW | Permitted | 0.6 km |
| Tealing Battery Energy Storage Farm | Power plant | 80 MW | Permitted | 1.8 km |
| Dodd Hill | Power plant | 12.5 MW | Cancelled | 2.4 km |
| Ashludie Primary | Substation | — | — | 4.7 km |
| Longhaugh Primary | Substation | — | — | 5.3 km |
| Edzell Street Primary | Substation | — | — | 5.4 km |
Holder, grid operator and place
More from Greentech Projects Holding UK Limited
- Seggiecrook Farm BESS and Solar grid connection126 MW
- Pusk Farm Solar and BESS grid connection109 MW
- Pusk Farm Solar and BESS grid connection109 MW
- Brownside Farm grid connection35.2 MW
- 28MW Mains of DUN PV grid connection28 MW
- Aberdour Solar Farm grid connection25 MW
- Sheepbridge Court Farm Cottages grid connection19 MW
- Lower House Farm grid connection12 MW
Other grid connections in Scotland
- Marram Wind Offshore Wind Farm grid connection3,000 MW
- OWPL Windfarm grid connection2,250 MW
- Caledonia Offshore Wind Farm grid connection2,000 MW
- Machair Offshore Wind Farm grid connection2,000 MW
- Arven Offshore Wind Farm grid connection1,800 MW
- Bellrock Offshore Wind Farm grid connection1,800 MW
- Earba PSH grid connection1,800 MW
- Glen Earrach PSH grid connection1,800 MW
Data on this page
- California ISO. Checked 2026-10-24. CAISO queue report, CAISO Privacy and Terms of Use.
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- Rare Context entity resolution. Rare Context entity resolution, CC0 1.0.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.