Power plant · Angus, Scotland, United Kingdom
Tealing Battery Energy Storage Farm
Tealing Battery Energy Storage Farm is a permitted battery storage plant in Angus, Scotland, United Kingdom, with 80 MW of capacity, operated by Sirius EcoDev Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Angus (coordinates), Scotland | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | 800m Ne/O Gagie Farm, Kellas, DD5 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 13 Dec 2023 (permit ECU00003354, Electricity Act 1989 section 36, issued by Scottish Government (S36)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 15 Oct 2021 (reference ECU00003354, planning authority Scottish Government (S36)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 13 Dec 2023 (granted, reference ECU00003354, planning authority Scottish Government (S36)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Sirius EcoDev Limited (applicant) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 80 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (co-located with re) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 56.5106, -2.8802 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit granted (planning authority Scottish Government (S36), reference ECU00003354)
- Permit applied for (planning authority Scottish Government (S36), reference ECU00003354)
How it compares
Tealing Battery Energy Storage Farm is the 188th-largest of 742 power plants planned, permitted or under construction in Scotland and the 540th-largest of 2,549 in the United Kingdom by capacity; its 80 MW is <0.1% of the 279,978 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 188th of 742 | 93,216 MW | <0.1% |
| United Kingdom | 540th of 2,549 | 279,978 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 1,476th of 5,782 | 643,557 MW | <0.1% |
Nearby
Within 50 km of this power plant: 94 grid connections (28 operating, 404 MW) and 68 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Wellbank grid connection | Grid connection | 25 MW | Planned | 1.8 km |
| Baldovie EFW Line 3 grid connection | Grid connection | 9.5 MW | Operating | 3.1 km |
| Baldovie Waste to Energy Plant grid connection | Grid connection | 8.27 MW | Operating | 3.1 km |
| Baldovie Primary | Substation | — | — | 3.7 km |
| Longhaugh Primary | Substation | — | — | 3.7 km |
| Edzell Street Primary | Substation | — | — | 3.9 km |
Operator and place
More from Sirius EcoDev Limited
- Tealing Solar Energy Park - Phase 2110 MW · permitted
- Calder Works, Burnley Road - Battery Energy Storage System70 MW
- The Greenlink Converter Station - Lambeeth Battery Energy Storage49.9 MW · permitted
Other power plants in Scotland
- Longannet2,260 MW
- Torness1,200 MW
- Peterhead1,180 MW
- Seagreen1,075 MW
- Hunterston B985 MW
- Moray East950 MW
- Moray West Offshore Wind Farm Project882 MW
- Auchentiber Road - Battery Energy Storage System700 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.