Power plant · Fife, Scotland, United Kingdom
Parkend Crossgates - Solar Panels & Battery Storage
Parkend Crossgates - Solar Panels & Battery Storage is a permitted power plant in Fife, Scotland, United Kingdom, with 30 MW of capacity, operated by Greentech Projects Holding UK Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Fife (coordinates), Scotland | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Parkend Crossgates, KY4 8EX | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 7 Mar 2024 (permit 22/03982/FULL, Town and Country Planning Act, issued by Fife) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 28 Nov 2022 (reference 22/03982/FULL, planning authority Fife) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 7 Mar 2024 (granted, reference 22/03982/FULL, planning authority Fife) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Greentech Projects Holding UK Limited | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 30 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Area | 32.6 ha (solar site area) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 56.0730, -3.3379 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Parkend Crossgates - Solar Panels & Battery Storage is the 501st-largest of 872 power plants planned, permitted or under construction in Scotland and the 1,569th-largest of 3,222 in the United Kingdom by capacity; its 30 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 501st of 872 | 99,272 MW | <0.1% |
| United Kingdom | 1,569th of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 2,981st of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 48 grid connections (15 operating, 284 MW), 34 substations and 10 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Pulsant Edinburgh SC-1 | Data center | — | — | 16 km |
| Pulsant Edinburgh South Gyle SC-1 | Data center | — | — | 16 km |
| Lloyds Banking Group data center, Scotland | Data center | — | — | 16 km |
| Milnathort Primary | Substation | — | — | 18 km |
| Glendevon Primary | Substation | — | — | 23 km |
| Shire End 20MW PV grid connection | Grid connection | 20 MW | Planned | 23 km |
| Binn Farm Glenfarg grid connection | Grid connection | 30 MW | Planned | 24 km |
| Fragland grid connection | Grid connection | 120 MW | Planned | 25 km |
| Abernethy GSP | Substation | — | — | 30 km |
Operator and place
More from Greentech Projects Holding UK Limited
- Pencaerlan Solar Farm25 MW · planned
- Parkend Crossgates - Solar Panels & Battery Storage9 MW · permitted
- Seggiecrook Farm BESS and Solar grid connection126 MW
- Pusk Farm Solar and BESS grid connection109 MW
- Pusk Farm Solar and BESS grid connection109 MW
- Brownside Farm grid connection35.2 MW
- 28MW Mains of DUN PV grid connection28 MW
- Aberdour Solar Farm grid connection25 MW
Other power plants in Scotland
- Seagreen1,075 MW
- Moray East950 MW
- Moray West Offshore Wind Farm Project882 MW
- Lewis Wind Farm (Barvas Moor)652 MW
- Beatrice588 MW
- Neart na Gaoithe450 MW
- Viking Wind Farm443 MW
- Cruachan440 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.