Grid connection · England, United Kingdom

Sheepbridge Court Farm Cottages grid connection

Sheepbridge Court Farm Cottages grid connection is a planned grid connection in England, United Kingdom, with 19 MW of capacity, held by Greentech Projects Holding UK Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceSHEEPBRIDGE COURT FARM COTTAGES grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at Reading)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderGreentech Projects Holding UK LimitedSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toReading Primary (via a primary substation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity19 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologySolarSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date12 Apr 2024SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date31 Dec 2026 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates51.3827, -0.9657SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Sheepbridge Court Farm Cottages grid connection is the 1,108th-largest of 2,533 grid connections in England and the 1,762nd-largest of 3,903 in the United Kingdom by capacity; its 19 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,108th of 2,533319,370 MW<0.1%
United Kingdom1,762nd of 3,903446,745 MW<0.1%
All grid connections in our data5,244th of 7,6161,281,251 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 252 power plants (89 operating, 1,310 MW), 243 substations and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Spencers Wood Solar Farm, Basingstoke Road - Solar ArrayPower plant28 MWPermitted0.2 km
Sheepbridge Court FarmPower plant5 MWOperating1.0 km
Aborfield Solar ParkPower plant14 MWUnder construction3.3 km
Arborfield PrimarySubstation——3.9 km
Courages PrimarySubstation——4.4 km
Whitley Wood PrimarySubstation——4.4 km
SDC M40 CampusData center—Planned34 km

Holder, grid operator and place

More from Greentech Projects Holding UK Limited

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page