Stoneyhill Farm 49.9MW grid connection

Stoneyhill Farm 49.9MW grid connection is a planned grid connection in Scotland, United Kingdom, with 100 MW of capacity, connected by Scottish Hydro Electric Power Distribution plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceSTONEYHILL FARM 49.9MW grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Peterhead Grange 33KV)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toPeterhead Grange Primary (via a primary substation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity100 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyBattery storageSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologySolarSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date14 May 2025SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date31 May 2032 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates57.4626, -1.8681SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

Stoneyhill Farm 49.9MW grid connection is the 68th-largest of 1,192 grid connections in Scotland and the 439th-largest of 3,903 in the United Kingdom by capacity; its 100 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland68th of 1,19288,894 MW0.11%
United Kingdom439th of 3,903446,745 MW<0.1%
All grid connections in our data3,304th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 175 power plants (51 operating, 1,581 MW), 64 substations and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Stoneyhill Landfill SitePower plant4.3 MWOperating0.2 km
Stoneyhill PrimarySubstation——0.4 km
Hillhead Of Gask, Longhaven - Solar ArrayPower plant14.2 MWUnder construction1.0 km
Greystone, Blackhills - Battery Energy Storage SystemPower plant500 MWPlanned2.1 km
Peterhead Shell GSPSubstation——4.2 km
Hatton PrimarySubstation——4.3 km
BrightsolidData center——39 km

Grid operator and place