Data center · England, United Kingdom

GridJet

GridJet is a data center in England, United Kingdom, with a 1,160 m² building.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandOpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Address4 The Tristram Centre, Leeds, LS12 6BFOpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Building footprint1,160 m² (building, 2 buildings)OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Coordinates53.7831, -1.5735OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026

Research on this data center and its owner.Who owns it up to the parent company, its power supply, grid connection and planning status, and an introduction to the owner.

Request research

Nearby

Within 50 km of this data center: 462 grid connections (234 operating, 2,366 MW), 430 substations, 399 power plants (108 operating, 3,957 MW) and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Generation 2 MW grid connection at Beeston Royds 6/7Grid connection2 MWOperating0.2 km
Oil 1.6 MW grid connection at Beeston Royds 33/11kVGrid connection1.6 MWOperating0.8 km
Battery storage 49.9 MW grid connection at Elawan Energy BESS DirectGrid connection49.9 MWPlanned0.9 km
Beeston Royds 6/7Substation——1.0 km
Beeston Royds 33/11kVSubstation——1.0 km
Beeston Royds 132/33kVSubstation——1.1 km
Redcote Lane, Armley - Battery Storage FacilityPower plant60 MWCancelled2.8 km
Pollington Energy ParkPower plant53 MWCancelled3.5 km
Buslingthorpe Power Station (Leeds North)Power plant2 MWOperating4.2 km

Place

Other data centers in England

All 245 data centers in England, United Kingdom