Power plant · North Yorkshire, England, United Kingdom

Wormald Green Solar Farm

Wormald Green Solar Farm is a permitted power plant in North Yorkshire, England, United Kingdom, with 43 MW of capacity, operated by Harmony Energy Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorth Yorkshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand Comprising Field At 431305 464500 Station Lane Burton Leonard, HG3DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date31 Jul 2025 (permit ZC23/04361/EIAMAJ, Town and Country Planning Act, issued by North Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date4 Dec 2023 (ref. ZC23/04361/EIAMAJ, North Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date31 Jul 2025 (granted, ref. ZC23/04361/EIAMAJ, North Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorHarmony Energy LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity43 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area66.6 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.0700, -1.4997DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Wormald Green Solar Farm is the 822nd-largest of 2,174 power plants planned, permitted or under construction in England and the 1,315th-largest of 3,222 in the United Kingdom by capacity; its 43 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England822nd of 2,174186,088 MW<0.1%
United Kingdom1,315th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data2,478th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 259 grid connections (127 operating, 1,295 MW), 239 substations and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Battery storage and Solar 16 MW grid connection at Wormald Green 132/11kV DirectGrid connection16 MWPlanned1.1 km
Wormald Green 132/11kV DirectSubstation——1.6 km
Wormald Green 132/33kVSubstation——1.6 km
Battery storage and Solar 75.5 MW grid connection at Leyton HybridGrid connection75.5 MWOperating2.2 km
Solar 40 MW grid connection at Wath Lane Solar FarmGrid connection40 MWPlanned2.5 km
KnaresboroughSubstation——4.3 km
Yorkshire GREENTransmission line—Permitted24 km

Operator and place

More from Harmony Energy Limited

Other power plants in England

All 5809 power plants in England, United Kingdom