Grid connection · England, United Kingdom
Brookbarn Farm grid connection
Brookbarn Farm grid connection is a grid connection in England, United Kingdom, with 3 MW of capacity, held by Anesco.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England (connects at Littlehampton 11kV) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Status | Operating (connected) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Holder | Anesco | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Attached to | Littlehampton 11kV (via a primary substation) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Attached to | Land at Brookbarn Farm (matched by shared name+coordinates+technology+capacity+company, 1.42 km away) | Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026 |
| Capacity | 3 MW | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Technology | Solar | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Grid operator | South Eastern Power Networks plc (UK Power Networks, South East England licence area) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Connection date | 10 Jul 2015 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Voltage | 11 kV | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Coordinates | 50.8265, -0.5591 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
Latest events
Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.
- Commissioned: Land at Brookbarn Farm
- Permit granted: Land at Brookbarn Farm (planning authority Arun, reference LU/385/14/PL)
- Permit applied for: Land at Brookbarn Farm (planning authority Arun, reference LU/385/14/PL)
How it compares
Brookbarn Farm grid connection is the 2,757th-largest of 3,539 grid connections in England and the 3,794th-largest of 4,870 in the United Kingdom by capacity; its 3 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 2,757th of 3,539 | 341,715 MW | <0.1% |
| United Kingdom | 3,794th of 4,870 | 467,981 MW | <0.1% |
| All grid connections in our data | 7,518th of 8,618 | 1,355,288 MW | <0.1% |
Nearby
Within 50 km of this grid connection: 154 power plants (67 operating, 1,272 MW), 142 substations, 13 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Land at Brookbarn Farm | Power plant | 3 MW | Operating | 1.4 km |
| New Circular Technology Park | Power plant | 28 MW | Cancelled | 2.0 km |
| New Circular Technology Park | Power plant | 14 MW | Cancelled | 2.1 km |
| Littlehampton 11kV | Substation | — | — | 2.2 km |
| Bilsham Primary | Substation | — | — | 4.8 km |
| Angmering 11kV | Substation | — | — | 5.1 km |
| IBM Horsham | Data center | — | — | 26 km |
| SSE data center, Havant | Data center | — | — | 30 km |
| Aquind Interconnector | Transmission line | — | Planned | 35 km |
Holder, grid operator and place
More from Anesco
- Persley Waste Water Treatment Works grid connection72.6 MW
- 49.9MW Battery grid connection57 MW
- The Waters BESS grid connection55 MW
- Mybster BESS grid connection35 MW
- Clayhill Farm (Clayhill 2) grid connection34.9 MW
- (ANM) Weirs Drove 2 grid connection30 MW
- Nairn BESS grid connection29.4 MW
- Cefn Estate grid connection19 MW
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. CAISO queue report, CAISO Privacy and Terms of Use.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- Rare Context entity resolution. Rare Context entity resolution, CC0 1.0.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.
- UK Power Networks. UK Power Networks open data portal, CC BY 4.0.