Grid connection · Scotland, United Kingdom

The Waters BESS grid connection

The Waters BESS grid connection is a planned grid connection in Scotland, United Kingdom, with 55 MW of capacity, held by Anesco Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceTHE WATERS BESS grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Fettersso Grid)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderAnesco LimitedSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity55 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyBattery storageSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date3 Jan 2024SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date31 Oct 2028 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates56.9503, -2.3771SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

The Waters BESS grid connection is the 163rd-largest of 1,192 grid connections in Scotland and the 724th-largest of 3,903 in the United Kingdom by capacity; its 55 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland163rd of 1,19288,894 MW<0.1%
United Kingdom724th of 3,903446,745 MW<0.1%
All grid connections in our data3,653rd of 7,6161,281,251 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 168 power plants (43 operating, 1,605 MW) and 76 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Jacksbank Wind Farm (Glenbervie)Power plant6.8 MWOperating1.1 km
Land South West Of Backfield FarmPower plant2.3 MWCancelled2.3 km
Fetteresso GSPSubstation——2.4 km
Fetteresso Wind Farm (Mid Hill 3)Power plant42 MWPermitted2.7 km
Fiddes GSPSubstation——5.4 km
Stonehaven PrimarySubstation——8.8 km

Holder, grid operator and place

More from Anesco Limited

Other grid connections in Scotland

All 1192 grid connections in Scotland, United Kingdom

Data on this page