Power plant · Arun, England, United Kingdom

New Circular Technology Park

New Circular Technology Park is a cancelled power plant in Arun, England, United Kingdom, with 28 MW of capacity, operated by Grundon Waste Management.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationArun (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressNew Circular Technology Park, Ford Airfield Industrial Estat, Ford, Arundel, BN18 0HYDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning application withdrawn)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date1 Apr 2021 (reference WSCC/011/21, planning authority Arun)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date26 Nov 2021 (withdrawn, reference WSCC/011/21, planning authority Arun)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorGrundon Waste Management (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity28 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyEfW IncinerationDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates50.8214, -0.5867DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Withdrawn (planning authority Arun, reference WSCC/011/21)
  2. Permit applied for (planning authority Arun, reference WSCC/011/21)

How it compares

New Circular Technology Park is the 697th-largest of 4,035 power plants in England and the 1,164th-largest of 5,834 in the United Kingdom by capacity; its 28 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England697th of 4,035134,434 MW<0.1%
United Kingdom1,164th of 5,834200,500 MW<0.1%
All power plants in our data5,485th of 15,7991,918,113 MW<0.1%

Nearby

Within 50 km of this power plant: 97 grid connections (56 operating, 543 MW), 82 substations, 11 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Binstead Farm grid connectionGrid connection12.2 MWPlanned2.5 km
Solar 10 MW grid connection at BilshamGrid connection10 MWOperating2.8 km
Solar 10 MW grid connection at BilshamGrid connection10 MWOperating2.8 km
Bilsham PrimarySubstation——2.9 km
South Bersted PrimarySubstation——6.2 km
Argyle Road PrimarySubstation——7.7 km
IBM HorshamData center——28 km
SSE data center, HavantData center——28 km
Aquind InterconnectorTransmission line—Planned34 km

Operator and place

More from Grundon Waste Management

Other power plants in England

All 5872 power plants in England, United Kingdom