Power plant · Arun, England, United Kingdom
New Circular Technology Park
New Circular Technology Park is a cancelled power plant in Arun, England, United Kingdom, with 28 MW of capacity, operated by Grundon Waste Management.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Arun (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | New Circular Technology Park, Ford Airfield Industrial Estat, Ford, Arundel, BN18 0HY | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Cancelled (planning application withdrawn) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 1 Apr 2021 (reference WSCC/011/21, planning authority Arun) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 26 Nov 2021 (withdrawn, reference WSCC/011/21, planning authority Arun) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Grundon Waste Management (applicant) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 28 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | EfW Incineration | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 50.8214, -0.5867 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Withdrawn (planning authority Arun, reference WSCC/011/21)
- Permit applied for (planning authority Arun, reference WSCC/011/21)
How it compares
New Circular Technology Park is the 697th-largest of 4,035 power plants in England and the 1,164th-largest of 5,834 in the United Kingdom by capacity; its 28 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 697th of 4,035 | 134,434 MW | <0.1% |
| United Kingdom | 1,164th of 5,834 | 200,500 MW | <0.1% |
| All power plants in our data | 5,485th of 15,799 | 1,918,113 MW | <0.1% |
Nearby
Within 50 km of this power plant: 97 grid connections (56 operating, 543 MW), 82 substations, 11 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Binstead Farm grid connection | Grid connection | 12.2 MW | Planned | 2.5 km |
| Solar 10 MW grid connection at Bilsham | Grid connection | 10 MW | Operating | 2.8 km |
| Solar 10 MW grid connection at Bilsham | Grid connection | 10 MW | Operating | 2.8 km |
| Bilsham Primary | Substation | — | — | 2.9 km |
| South Bersted Primary | Substation | — | — | 6.2 km |
| Argyle Road Primary | Substation | — | — | 7.7 km |
| IBM Horsham | Data center | — | — | 28 km |
| SSE data center, Havant | Data center | — | — | 28 km |
| Aquind Interconnector | Transmission line | — | Planned | 34 km |
Operator and place
More from Grundon Waste Management
- Lakeside EfW Colnbrook (Replacement)40 MW
- Bath Road, Grange Lane - Solar Photovoltaic Array12 MW · permitted
Other power plants in England
- Drax Power Station Biomass Units2,580 MW
- Ratcliffe-on-Soar2,021 MW
- Cottam2,000 MW
- Walpole Flexible Generation Project2,000 MW
- West Burton2,000 MW
- Eggborough1,960 MW
- Staythorpe1,828 MW
- Fiddler’s Ferry1,510 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DUKES 5.11: Power stations in the United Kingdom, Open Government Licence v3.0.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- JRC Open Power Plants Database (JRC-PPDB-OPEN), European Commission, Joint Research Centre. JRC Open Power Plants Database (JRC-PPDB-OPEN), CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Dutch power station owners' and operators' pages. Dutch power station owners' and operators' pages, Facts only, each linked to its page.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.
- Wikidata. Wikidata, CC0 1.0.