Grid connection · Scotland, United Kingdom
Mybster BESS grid connection
Mybster BESS grid connection is a planned grid connection in Scotland, United Kingdom, with 35 MW of capacity, held by Anesco Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Name in the source | MYBSTER BESS grid connection | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Location | Scotland (connection site: MYBSTER GRID) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Status | Planned (ACCEPTED TO CONNECT) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Holder | Anesco Limited | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Capacity | 35 MW | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | Scottish Hydro Electric Power Distribution plc | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Queue date | 2 Feb 2024 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Connection date | 31 Oct 2034 (target energisation) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 33 kV | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Coordinates | 58.4565, -3.4296 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
Know more about this grid connection, or want an introduction to its holder? Ask us.
How it compares
Mybster BESS grid connection is the 478th-largest of 1,518 grid connections in Scotland and the 1,375th-largest of 4,493 in the United Kingdom by capacity; its 35 MW is <0.1% of the 459,551 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 478th of 1,518 | 96,638 MW | <0.1% |
| United Kingdom | 1,375th of 4,493 | 459,551 MW | <0.1% |
Timeline
Dated facts about this grid connection from its sources, oldest first.
- Entered the connection queue
- Due to connect
Nearby
Within 50 km of this grid connection: 18 substations, measured from the coordinates in the facts above. The table shows the nearest 3.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Mybster 2 GSP | Substation | — | — | 1.2 km |
| Mybster 1 GSP | Substation | — | — | 1.2 km |
| Halkirk Primary | Substation | — | — | 6.3 km |
Holder, grid operator and place
More from Anesco Limited
- Persley Waste Water Treatment Works grid connection72.6 MW
- 49.9MW Battery grid connection57 MW
- The Waters BESS grid connection55 MW
- Nairn BESS grid connection29.4 MW
- Cefn Estate grid connection19 MW
- Iddenshall Grange grid connection14.9 MW
- Iddenshall Grange grid connection14.9 MW
- Broughton Moor 1 Solar PV grid connection9.99 MW
Other grid connections in Scotland
- Marram Wind Offshore Wind Farm grid connection3,000 MW
- OWPL Windfarm grid connection2,250 MW
- Caledonia Offshore Wind Farm grid connection2,000 MW
- Machair Offshore Wind Farm grid connection2,000 MW
- Arven Offshore Wind Farm grid connection1,800 MW
- Bellrock Offshore Wind Farm grid connection1,800 MW
- Earba PSH grid connection1,800 MW
- Glen Earrach PSH grid connection1,800 MW
Data on this page
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.