Power plant · Arun, England, United Kingdom
New Circular Technology Park
New Circular Technology Park is a cancelled power plant in Arun, England, United Kingdom, with 14 MW of capacity, operated by Grundon.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Arun (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | New Circular Technology Park (Former Ford Blockworks), Ford Airfield Industrial Estate, Ford, Arundel, West Sussex, BN18 0HY | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Cancelled (planning permission expired) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 27 May 2014 (permit WSCC/096/13/F, Town and Country Planning Act, issued by Arun) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 21 Nov 2013 (reference WSCC/096/13/F, planning authority Arun) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 27 May 2014 (granted, reference WSCC/096/13/F, planning authority Arun) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Grundon | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 14 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Advanced Conversion Technologies | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 50.8217, -0.5876 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
New Circular Technology Park is the 838th-largest of 3,430 power plants in England and the 1,490th-largest of 5,050 in the United Kingdom by capacity; its 14 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 838th of 3,430 | 71,985 MW | <0.1% |
| United Kingdom | 1,490th of 5,050 | 115,642 MW | <0.1% |
| All power plants in our data | 5,466th of 12,008 | 1,173,302 MW | <0.1% |
Nearby
Within 50 km of this power plant: 97 grid connections (56 operating, 543 MW), 82 substations, 11 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Binstead Farm grid connection | Grid connection | 12.2 MW | Planned | 2.4 km |
| Solar 10 MW grid connection at Bilsham | Grid connection | 10 MW | Operating | 2.7 km |
| Solar 10 MW grid connection at Bilsham | Grid connection | 10 MW | Operating | 2.7 km |
| Bilsham Primary | Substation | — | — | 2.9 km |
| South Bersted Primary | Substation | — | — | 6.2 km |
| Argyle Road Primary | Substation | — | — | 7.7 km |
| SSE data center, Havant | Data center | — | — | 28 km |
| IBM Horsham | Data center | — | — | 28 km |
| Aquind Interconnector | Transmission line | — | Planned | 33 km |
Operator and place
More from Grundon
- Shore Road16 MW
- Wingmoor Farm (Waste AD)1.6 MW
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.