Data center · England, United Kingdom
SSE data center, Havant
SSE data center, Havant is a data center in England, United Kingdom, operated by Scottish and Southern Energy.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Address | Martin Road, Havant, PO9 5TH | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Operator | Scottish and Southern Energy | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Building footprint | 1,144 m² (building) | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Coordinates | 50.8664, -0.9757 | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
Research on this data center and its operator.Who owns it up to the parent company, its power supply, grid connection and planning status, and an introduction to the operator.
Request researchNearby
Within 50 km of this data center: 236 power plants (99 operating, 744 MW), 188 grid connections (110 operating, 971 MW), 160 substations and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Leigh Park Primary | Substation | — | — | 0.1 km |
| Waste 3.335 MW grid connection at Leigh Park | Grid connection | 3.34 MW | Operating | 1.3 km |
| Bedhampton Pumping Station, Meyrick Road - Battery Energy Storage | Power plant | 150 MW | Planned | 1.5 km |
| Southleigh Landfill | Power plant | 3.5 MW | Operating | 1.8 km |
| Meyrick Road Primary | Substation | — | — | 2.0 km |
| Bedhampton BESS grid connection | Grid connection | 57 MW | Planned | 2.2 km |
| Dunsbury Park, Fitzwygram Way - Solar Panels | Power plant | 1.25 MW | Permitted | 2.3 km |
| Brockhampton Primary | Substation | — | — | 2.5 km |
| Sewage gas 3.135 MW grid connection at Brockhampton | Grid connection | 3.14 MW | Operating | 2.6 km |
Operator and place
More from Scottish and Southern Energy
- Dogger Bank A & B (was Creyke Beck A & B)2,400 MW · under construction
- Dogger Bank C (was Teesside A)1,200 MW · under construction
- Seagreen1,075 MW
- Beatrice588 MW
- Seagreen Phase 1A540 MW · permitted
- Clyde Wind Farm350 MW
- North Nesting Wind, Shetland250 MW
- Muckla Moor249 MW
Other data centers in England
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.