Park Shield is a cancelled power plant in Northumberland, England, United Kingdom, with 1 MW of capacity, operated by JFS Biogas.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorthumberland (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand North Of Fourstones Substation FourstonesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (appeal refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date3 Jul 2014 (reference 14/02186/RENE, planning authority Northumberland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date15 Sept 2015 (appeal refused, reference 14/02186/RENE, planning authority Northumberland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date7 Jan 2015 (refused, reference 14/02186/RENE, planning authority Northumberland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorJFS BiogasDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyAnaerobic DigestionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates55.0151, -2.1612DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (appeal refused, planning authority Northumberland, reference 14/02186/RENE)
  2. Permit refused (planning authority Northumberland, reference 14/02186/RENE)
  3. Permit applied for (planning authority Northumberland, reference 14/02186/RENE)

How it compares

Park Shield is the 3,301st-largest of 3,430 power plants in England and the 4,866th-largest of 5,050 in the United Kingdom by capacity; its 1 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England3,301st of 3,43071,965 MW<0.1%
United Kingdom4,866th of 5,050115,622 MW<0.1%
All power plants in our data11,814th of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 153 grid connections (75 operating, 966 MW), 114 substations, 1 data center and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.

NameKindSizeStatusDistance
Fourstones 20kVSubstation——0.4 km
Fourstones 33kVSubstation——0.4 km
Battery storage and Solar 80 MW grid connection at Fourstones HybridGrid connection80 MWPlanned1.1 km
Battery storage and Solar 112 MW grid connection at Carr Edge Farm BESSGrid connection112 MWPlanned2.1 km
HexhamSubstation——6.0 km
Biomass 2.5 MW grid connection at HexhamGrid connection2.5 MWOperating6.2 km
Stellium Newcastle CampusData center——42 km
Cross Border Connection (England)Transmission line—Planned42 km

Operator and place

More from JFS Biogas

Other power plants in England

All 5809 power plants in England, United Kingdom