Power plant · Hartlepool, England, United Kingdom

High Barnes Farm, Coal Lane - Battery Storage

High Barnes Farm, Coal Lane - Battery Storage is a permitted power plant in Hartlepool, England, United Kingdom, with 25 MW of capacity, operated by Enviromena Project Management UK Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationHartlepool (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressHigh Barnes Farm, Coal Lane, Elwick, Hartlepool, TS27 3HDDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date28 May 2025 (permit H/2024/0180, Town and Country Planning Act, issued by Hartlepool)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date6 Aug 2024 (reference H/2024/0180, planning authority Hartlepool)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date28 May 2025 (granted, reference H/2024/0180, planning authority Hartlepool)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorEnviromena Project Management UK LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity25 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (co-located with re)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.6837, -1.3178DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

High Barnes Farm, Coal Lane - Battery Storage is the 1,108th-largest of 2,174 power plants planned, permitted or under construction in England and the 1,741st-largest of 3,222 in the United Kingdom by capacity; its 25 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,108th of 2,174186,088 MW<0.1%
United Kingdom1,741st of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data3,376th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 269 grid connections (135 operating, 1,293 MW), 162 substations and 5 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Battery storage and Solar 75 MW grid connection at High Barnes Farm HybridGrid connection75 MWPlanned0.6 km
Wind 5.25 MW grid connection at Hartmoor 66/20kVGrid connection5.25 MWOperating1.6 km
Whelley Hill Farm Charging 2 grid connectionGrid connection12 MWPlanned2.3 km
HartmoorSubstation——2.7 km
Hartmoor 66/20kVSubstation——2.7 km
WynyardSubstation——4.9 km
DXC Wynyard Data CenterData center——5.6 km
Lumen Technologies data center, MiddlesbroughData center——13 km
Pulsant data center, EnglandData center——15 km

Operator and place

More from Enviromena Project Management UK Limited

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page