Power plant · York, England, United Kingdom

Harewood Whin Landfill Site Power Station

Harewood Whin Landfill Site Power Station is a biomass power plant in York, England, United Kingdom, with 2.4 MW of capacity, operated by Biogas and Yorwaste.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationYork (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressHarewood Whin Tinkers Lane Rufforth North YokshireDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year1997DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date2 Dec 1994 (Town and Country Planning Act, issued by York)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date10 Aug 1994 (planning authority York)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date2 Dec 1994 (granted, planning authority York)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorBiogas (Yorwaste /Biogas)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorYorwaste (Yorwaste /Biogas)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity2.4 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyLandfill GasDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.9586, -1.1693DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority York)
  3. Permit applied for (planning authority York)

How it compares

Harewood Whin Landfill Site is the 3,194th-largest of 4,035 power plants in England and the 4,639th-largest of 5,834 in the United Kingdom by capacity; its 2.4 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England3,194th of 4,035134,434 MW<0.1%
United Kingdom4,639th of 5,834200,500 MW<0.1%
All power plants in our data13,737th of 15,7991,918,113 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 350 grid connections (174 operating, 1,977 MW), 261 substations, 4 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Wind 3.325 MW grid connection at Gale LaneGrid connection3.33 MWOperating1.1 km
Battery storage 60 MW grid connection at Wheatlands BESSGrid connection60 MWPlanned2.5 km
Solar 49.9 MW grid connection at Wheatlands BESSGrid connection49.9 MWPlanned2.5 km
Gale LaneSubstation——3.0 km
PoppletonSubstation——3.0 km
Severus HillSubstation——3.3 km
Yorkshire GREENTransmission line—Permitted9.5 km
VocaLinkData center——26 km
HSBC Wakefield Data CentreData center——31 km

Operators and place

Other power plants in England

All 5872 power plants in England, United Kingdom