Power plant · Redcar and Cleveland, England, United Kingdom
Wilton International, Greystones Road - Phase 1
Wilton International, Greystones Road - Phase 1 is a permitted power plant in Redcar and Cleveland, England, United Kingdom, with 150 MW of capacity, operated by Sembcorp Utilities Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Redcar and Cleveland (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Wilton International, Lazenby, TS6 8JH | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 4 Oct 2023 (permit R/2023/0545/CL, Town and Country Planning Act, issued by Redcar and Cleveland) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 11 Aug 2023 (reference R/2023/0545/CL, planning authority Redcar and Cleveland) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 4 Oct 2023 (granted, reference R/2023/0545/CL, planning authority Redcar and Cleveland) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Sembcorp Utilities Limited (Sembcorp Utilities (UK) Limited) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 150 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 54.5738, -1.1263 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Wilton International, Greystones Road - Phase 1 is the 219th-largest of 2,174 power plants planned, permitted or under construction in England and the 349th-largest of 3,222 in the United Kingdom by capacity; its 150 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 219th of 2,174 | 186,088 MW | <0.1% |
| United Kingdom | 349th of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 998th of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 228 grid connections (116 operating, 1,220 MW), 112 substations and 4 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Battery storage 250 MW grid connection at Old Hill Farm Direct | Grid connection | 250 MW | Planned | 0.6 km |
| Lackenby | Substation | — | — | 0.8 km |
| Gas 12 MW grid connection at Grangetown | Grid connection | 12 MW | Operating | 1.4 km |
| Landfill gas 2.027 MW grid connection at Grangetown | Grid connection | 2.03 MW | Operating | 1.6 km |
| Grangetown | Substation | — | — | 1.7 km |
| Spencerbeck | Substation | — | — | 4.1 km |
| Data center, Redcar (OSM way 1055031579) | Data center | — | — | 6.4 km |
| Lumen Technologies data center, Middlesbrough | Data center | — | — | 7.0 km |
| Pulsant data center, England | Data center | — | — | 12 km |
Operator and place
More from Sembcorp Utilities Limited
- Tees CCPP1,700 MW · permitted
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.