Wilton International, Greystones Road - Phase 1 is a permitted power plant in Redcar and Cleveland, England, United Kingdom, with 150 MW of capacity, operated by Sembcorp Utilities Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationRedcar and Cleveland (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressWilton International, Lazenby, TS6 8JHDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date4 Oct 2023 (permit R/2023/0545/CL, Town and Country Planning Act, issued by Redcar and Cleveland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date11 Aug 2023 (reference R/2023/0545/CL, planning authority Redcar and Cleveland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date4 Oct 2023 (granted, reference R/2023/0545/CL, planning authority Redcar and Cleveland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorSembcorp Utilities Limited (Sembcorp Utilities (UK) Limited)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity150 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.5738, -1.1263DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Wilton International, Greystones Road - Phase 1 is the 219th-largest of 2,174 power plants planned, permitted or under construction in England and the 349th-largest of 3,222 in the United Kingdom by capacity; its 150 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England219th of 2,174186,088 MW<0.1%
United Kingdom349th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data998th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 228 grid connections (116 operating, 1,220 MW), 112 substations and 4 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Battery storage 250 MW grid connection at Old Hill Farm DirectGrid connection250 MWPlanned0.6 km
LackenbySubstation——0.8 km
Gas 12 MW grid connection at GrangetownGrid connection12 MWOperating1.4 km
Landfill gas 2.027 MW grid connection at GrangetownGrid connection2.03 MWOperating1.6 km
GrangetownSubstation——1.7 km
SpencerbeckSubstation——4.1 km
Data center, Redcar (OSM way 1055031579)Data center——6.4 km
Lumen Technologies data center, MiddlesbroughData center——7.0 km
Pulsant data center, EnglandData center——12 km

Operator and place

More from Sembcorp Utilities Limited

Other power plants in England

All 5809 power plants in England, United Kingdom