Power plant · County Durham, England, United Kingdom

Wagtail Lane, Craghead - Solar Panels

Wagtail Lane, Craghead - Solar Panels is a cancelled power plant in County Durham, England, United Kingdom, with 27 MW of capacity, operated by Ampyr Energy UK Development Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCounty Durham (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressS/O Wagtail Lane, Craghead, Stanley, DH9 7HHDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date7 Jan 2025 (reference DM/24/03466/FPA, planning authority County Durham)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date3 Dec 2025 (refused, reference DM/24/03466/FPA, planning authority County Durham)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorAmpyr Energy UK Development LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity27 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area57.8 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.8535, -1.6996DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (planning authority County Durham, reference DM/24/03466/FPA)
  2. Permit applied for (planning authority County Durham, reference DM/24/03466/FPA)

How it compares

Wagtail Lane, Craghead - Solar Panels is the 435th-largest of 3,430 power plants in England and the 826th-largest of 5,050 in the United Kingdom by capacity; its 27 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England435th of 3,43071,965 MW<0.1%
United Kingdom826th of 5,050115,622 MW<0.1%
All power plants in our data3,096th of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 278 grid connections (144 operating, 1,918 MW), 165 substations and 4 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Battery storage 46.55 MW grid connection at Morrow Edge SolarGrid connection46.6 MWPlanned1.6 km
Solar 45 MW grid connection at Morrow Edge SolarGrid connection45 MWPlanned1.6 km
Holmside Hall PV grid connectionGrid connection55.9 MWPlanned1.7 km
AnnfieldSubstation——2.1 km
Annfield 66/20kVSubstation——2.1 km
TanfieldSubstation——3.6 km
Stellium Newcastle CampusData center——22 km
DXC Wynyard Data CenterData center——35 km
Pulsant data center, EnglandData center——42 km

Operator and place

More from Ampyr Energy UK Development Limited

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page