Owner · Company
Ampyr Energy UK Development Limited
Ampyr Energy UK Development Limited is linked to 6 assets and rights in the United Kingdom: it operates 4 power plants and holds 2 grid connections.
Portfolio
The 6 assets and rights Ampyr Energy UK Development Limited owns, operates or holds, by class, with its role in each, across its 2 records. Sizes are the whole asset's, so they are not added up: the sources give no share for this owner.
Power plants 4
| Power plant | Location | Role | Capacity |
|---|---|---|---|
| Sutton-on-the-Forest, Brownmoor Lane - Solar Park | York, England, United Kingdom | Operator | 49.9 MW |
| Wagtail Lane, Craghead - Solar Panels | County Durham, England, United Kingdom | Operator | 27 MW |
| Sutton-on-the-Forest, Brownmoor Lane -BESS | York, England, United Kingdom | Operator | 10 MW |
| Main Terminal 1 Edinburgh Airport - Solar Farm | City of Edinburgh, Scotland, United Kingdom | Operator | 9 MW |
Grid connections 2
| Grid connection | Location | Role | Capacity |
|---|---|---|---|
| Hopetoun Newton grid connection | Scotland, United Kingdom | Holder | 52.3 MW |
| Hopetoun Threemiletown grid connection | Scotland, United Kingdom | Holder | 45 MW |
By country
Where the assets and rights are.
- The United Kingdom6 in 2 classes
Latest events
Dated events about Ampyr Energy UK Development Limited and its assets from official notices and registers, newest first. All recent changes.
- Permit refused: Wagtail Lane, Craghead - Solar Panels (planning authority County Durham, reference DM/24/03466/FPA)
- Permit applied for: Sutton-on-the-Forest, Brownmoor Lane -BESS (planning authority York, reference ZB25/01321/FUL)
- Permit applied for: Sutton-on-the-Forest, Brownmoor Lane - Solar Park (planning authority York, reference ZB25/01321/FUL)
- Permit applied for: Wagtail Lane, Craghead - Solar Panels (planning authority County Durham, reference DM/24/03466/FPA)
- Permit granted: Main Terminal 1 Edinburgh Airport - Solar Farm (planning authority City of Edinburgh, reference 21/05261/PNE)
- Permit applied for: Main Terminal 1 Edinburgh Airport - Solar Farm (planning authority City of Edinburgh, reference 21/05261/PNE)
Partners and counterparties
Owners, operators and grid operators on the same assets.
- SP Distribution plc2 shared
- City of Edinburgh Council1 shared
- Edinburgh Airport1 shared
Also recorded as
Sources name Ampyr Energy UK Development Limited under 2 records; this page joins them. Links to any of them lead here.
| Name in the source | Identifier | Source |
|---|---|---|
| Ampyr Energy UK Development Limited | party:name:ampyr-energy-uk-development-limited | DESNZ Renewable Energy Planning Database (REPD) |
| Ampyr Energy UK Development Ltd | party:name:ampyr-energy-uk-development-ltd | SP Energy Networks open data portal |
Research on Ampyr Energy UK Development Limited.Its full portfolio, its parent companies, and an introduction to the people who decide on buying and selling.
Request researchData on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Rare Context entity resolution. Rare Context entity resolution, CC0 1.0.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.