Power plant · Tonbridge and Malling, England, United Kingdom

Aylesford BESS

Aylesford BESS is a battery storage plant in Tonbridge and Malling, England, United Kingdom, with 29 MW of capacity, operated by Zenobē.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationTonbridge and Malling (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand North And West Of Solar Park Bull Lane Eccles Aylesford, ME20 6WTDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2020DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date5 Dec 2017 (permit 17/02496/FL, Town and Country Planning Act, issued by Tonbridge and Malling)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date5 Sept 2017 (reference 17/02496/FL, planning authority Tonbridge and Malling)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date5 Dec 2017 (granted, reference 17/02496/FL, planning authority Tonbridge and Malling)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorZenobēDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity29 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.3159, 0.4604DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority Tonbridge and Malling, reference 17/02496/FL)
  3. Permit applied for (planning authority Tonbridge and Malling, reference 17/02496/FL)

How it compares

Aylesford BESS is the 283rd-largest of 2,105 power plants in England and the 465th-largest of 2,942 in the United Kingdom by capacity; its 29 MW is <0.1% of the 105,383 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England283rd of 2,10572,593 MW<0.1%
United Kingdom465th of 2,942105,383 MW<0.1%
All power plants in our data4,388th of 12,2301,691,896 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 57 data centers, 1 grid connection and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 5, up to 3 per kind.

NameKindSizeStatusDistance
CXD Infrastructure SolutionsData center——7.3 km
CustodianDC MaidstoneData center——7.4 km
Sota DatacentreData center——18 km
Tertiary Study grid connectionGrid connection57 MWPlanned44 km
North London (Electricity Line) ReinforcementTransmission line—Permitted48 km