Power plant · Shetland Islands, Scotland, United Kingdom

Shetland Battery Energy Storage System

Shetland Battery Energy Storage System is a power plant under construction in Shetland Islands, Scotland, United Kingdom, with 70 MW of capacity, operated by Zenobe Energy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationShetland Islands (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLower Blackhill Industrial Estate, Genista, Lerwick, ZE1 0DGDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusUnder constructionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date21 Feb 2024 (permit ECU00004881, Electricity Act 1989 section 36, issued by Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date28 Jul 2023 (reference ECU00004881, planning authority Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date21 Feb 2024 (granted, reference ECU00004881, planning authority Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorZenobe EnergyDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity70 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates60.1714, -1.1650DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Shetland Battery Energy Storage System is the 227th-largest of 872 power plants planned, permitted or under construction in Scotland and the 626th-largest of 3,222 in the United Kingdom by capacity; its 70 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Scotland227th of 87299,272 MW<0.1%
United Kingdom626th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data1,580th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 24 grid connections (17 operating, 81.1 MW) and 10 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
North HOO Field Ltd grid connectionGrid connection2.3 MWPlanned0.4 km
North Fish (Shetland) Ltd grid connectionGrid connection2.3 MWPlanned0.4 km
Lerwick P S (G5) grid connectionGrid connection4.28 MWOperating0.5 km
Shetland / GremistaSubstation——0.5 km
Lerwick PrimarySubstation——0.6 km
Scalloway PrimarySubstation——6.2 km

Operator and place

More from Zenobe Energy

Other power plants in Scotland

All 2093 power plants in Scotland, United Kingdom

Data on this page