Grid connection · England, United Kingdom

Unit 2 Bellingham Way grid connection

Unit 2 Bellingham Way grid connection is a planned grid connection in England, United Kingdom, with 3.98 MW of capacity, held by Tesco.

Map: where Unit 2 Bellingham Way grid connection lies
51.3055, 0.4472 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at New Hythe Primary)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderTescoUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity3.98 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorSouth Eastern Power Networks plc (UK Power Networks, South East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date5 Aug 2025UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date30 Mar 2026 (target energisation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.3055, 0.4472UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

Unit 2 Bellingham Way grid connection is the 2,609th-largest of 3,539 grid connections in England and the 3,610th-largest of 4,870 in the United Kingdom by capacity; its 3.98 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England2,609th of 3,539341,715 MW<0.1%
United Kingdom3,610th of 4,870467,981 MW<0.1%
All grid connections in our data7,327th of 8,6181,355,288 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Was due to connect; the register does not list it as connected

Nearby

Within 50 km of this grid connection: 388 substations, 341 power plants (131 operating, 7,079 MW), 57 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Aylesford 6.6kVSubstation——1.5 km
Burham Grid 33kVSubstation——1.5 km
Aylesford BESSPower plant29 MWOperating1.5 km
Townsend Hook 6.6kVSubstation——2.4 km
Biossence Solar ParkPower plant4.5 MWOperating3.1 km
Allington EFWPower plant51 MWOperating3.8 km
CXD Infrastructure SolutionsData center——7.6 km
CustodianDC MaidstoneData center——7.7 km
Sota DatacentreData center——19 km

Holder, grid operator and place

More from Tesco

Other grid connections in England

All 4837 grid connections in England, United Kingdom