Power plant · Tameside, England, United Kingdom
Printworks Road - Stalybridge Battery Storage
Printworks Road - Stalybridge Battery Storage is a permitted power plant in Tameside, England, United Kingdom, with 150 MW of capacity, operated by Zenobe Energy.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Tameside (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | South Of Stalybridge Substation Printworks Road Stalybridge, SK15 3BD | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 15 Dec 2023 (permit 23/00770/FUL, Town and Country Planning Act, issued by Tameside) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 11 Sept 2023 (reference 23/00770/FUL, planning authority Tameside) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 15 Dec 2023 (granted, reference 23/00770/FUL, planning authority Tameside) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Zenobe Energy | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 150 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 53.4953, -2.0404 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit granted (planning authority Tameside, reference 23/00770/FUL)
- Permit applied for (planning authority Tameside, reference 23/00770/FUL)
How it compares
Printworks Road - Stalybridge Battery Storage is the 219th-largest of 2,174 power plants planned, permitted or under construction in England and the 349th-largest of 3,222 in the United Kingdom by capacity; its 150 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 219th of 2,174 | 185,888 MW | <0.1% |
| United Kingdom | 349th of 3,222 | 300,461 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 998th of 6,455 | 664,040 MW | <0.1% |
Nearby
Within 50 km of this power plant: 556 substations, 470 grid connections (263 operating, 2,327 MW), 24 data centers and 3 gas storage facilities, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Hartshead-Heyrod BSP | Substation | — | — | 0.2 km |
| Heyrod | Substation | — | — | 0.2 km |
| Stalybridge GSP | Substation | — | — | 0.3 km |
| Tameside General Hospital grid connection | Grid connection | 1.22 MW | Operating | 1.9 km |
| Land West of Clarence Street grid connection | Grid connection | 2.5 MW | Planned | 2.3 km |
| Tame Power grid connection | Grid connection | 4.6 MW | Planned | 2.4 km |
| Data center, England (OSM way 703959498) | Data center | — | — | 9.5 km |
| Asanti Manchester | Data center | — | — | 13 km |
| CDL Strata Campus Data Centre | Data center | — | — | 13 km |
Operator and place
More from Zenobe Energy
- Eccles Battery Energy Storage System400 MW · under construction
- Low Harker Farm, Low Harker - Battery Storage Facility400 MW · permitted
- Kilmarnock South Substation - Battery storage300 MW
- Blackhillock Electricity Substation - Battery Energy Storage System300 MW · under construction
- Carlisle Road - Battery Energy Storage System200 MW · permitted
- National Grid Electricity Substation, Capenhurst Lane - Battery Storage100 MW
- Shetland Battery Energy Storage System70 MW · under construction
- Wishaw Battery Storage Facility50 MW
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.