Grid connection · Scotland, United Kingdom

Yonderton Wind grid connection

Yonderton Wind grid connection is a grid connection in Scotland, United Kingdom, with 4.37 MW of capacity, connected by Scottish Hydro Electric Power Distribution plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceYONDERTON WIND grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Macduff Grid)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusOperating (connected)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toBackhill of Yonderton Wind Cluster (matched by shared name+coordinates+technology+capacity, 0.38 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Attached toMacduff Primary (via a primary substation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity4.37 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyWindSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date4 Dec 2014SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates57.5860, -2.4098SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its grid operator.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the grid operator.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Commissioned: Backhill of Yonderton Wind Cluster
  2. Permit granted: Backhill of Yonderton Wind Cluster (planning authority Aberdeenshire, reference APP/2010/3054)
  3. Permit applied for: Backhill of Yonderton Wind Cluster (planning authority Aberdeenshire, reference APP/2010/3054)

How it compares

Yonderton Wind grid connection is the 856th-largest of 1,192 grid connections in Scotland and the 2,762nd-largest of 3,903 in the United Kingdom by capacity; its 4.37 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland856th of 1,19288,894 MW<0.1%
United Kingdom2,762nd of 3,903446,745 MW<0.1%
All grid connections in our data6,742nd of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 215 power plants (66 operating, 1,362 MW) and 58 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Backhill of Yonderton Wind ClusterPower plant4.6 MWOperating0.4 km
Gairnieston FarmPower plant2.3 MWOperating1.2 km
Cairnhill Farm solar parkPower plant2.4 MWOperating3.6 km
Turriff PrimarySubstation——5.8 km
Macduff PrimarySubstation——10 km
Macduff GSPSubstation——10 km

Grid operator and place

More from Scottish Hydro Electric Power Distribution plc

Other grid connections in Scotland

All 1192 grid connections in Scotland, United Kingdom

Data on this page