Power plant · Aberdeenshire, Scotland, United Kingdom

Cairnhill Farm solar park

Cairnhill Farm solar park is a solar power plant in Aberdeenshire, Scotland, United Kingdom, with 2.4 MW of capacity, operated by Green Cat Renewables.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationAberdeenshire (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressCairnhill, Turriff, Grampian, AB53 5TNDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2015DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date31 May 2013 (permit APP/2013/0997, Town and Country Planning Act, issued by Aberdeenshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date2 Apr 2013 (reference APP/2013/0997, planning authority Aberdeenshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date31 May 2013 (granted, reference APP/2013/0997, planning authority Aberdeenshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorGreen Cat RenewablesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity2.4 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area9.8 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates57.5621, -2.3691DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority Aberdeenshire, reference APP/2013/0997)
  3. Permit applied for (planning authority Aberdeenshire, reference APP/2013/0997)

How it compares

Cairnhill Farm solar park is the 1,058th-largest of 1,342 power plants in Scotland and the 4,642nd-largest of 5,837 in the United Kingdom by capacity; its 2.4 MW is <0.1% of the 200,833 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Scotland1,058th of 1,34246,828 MW<0.1%
United Kingdom4,642nd of 5,837200,833 MW<0.1%
All power plants in our data10,966th of 13,0281,354,089 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 125 grid connections (56 operating, 329 MW), 70 substations and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Yonderton Wind grid connectionGrid connection4.37 MWOperating3.6 km
Bogenlea Wind Generation grid connectionGrid connection2.19 MWOperating4.1 km
Little Hilton Windfarm grid connectionGrid connection2.19 MWOperating4.5 km
Turriff PrimarySubstation——6.0 km
New Pitsligo PrimarySubstation——11 km
Macduff PrimarySubstation——14 km
BrightsolidData center——47 km

Operator and place

More from Green Cat Renewables

Other power plants in Scotland

All 2107 power plants in Scotland, United Kingdom

Data on this page