Solar 16.94 MW grid connection at Huntingdon Grid 33kV

Solar 16.94 MW grid connection at Huntingdon Grid 33kV is a grid connection in England, United Kingdom, with 16.9 MW of capacity, held by Anesco.

Map: where Solar 16.94 MW grid connection at Huntingdon Grid 33kV lies
52.4115, -0.2215 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Huntingdon Grid 33kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusOperating (connected)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderAnescoUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toRed House Farm - Solar Farm (matched by coordinates+technology+capacity+company, 0.81 km away)Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026
Capacity16.9 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date27 Feb 2026UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage33 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates52.4115, -0.2215UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Latest events

Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.

  1. Permit granted: Red House Farm - Solar Farm (planning authority Huntingdonshire, reference 21/01809/FUL)
  2. Permit applied for: Red House Farm - Solar Farm (planning authority Huntingdonshire, reference 21/01809/FUL)

How it compares

Solar 16.94 MW grid connection at Huntingdon Grid 33kV is the 1,518th-largest of 3,539 grid connections in England and the 2,168th-largest of 4,870 in the United Kingdom by capacity; its 16.9 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,518th of 3,539341,715 MW<0.1%
United Kingdom2,168th of 4,870467,981 MW<0.1%
All grid connections in our data5,715th of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 417 power plants (160 operating, 4,858 MW), 90 substations and 6 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Woodwalton Primary 11kVSubstation——0.5 km
Red House Farm - Solar FarmPower plant20 MWCancelled0.8 km
Abbey FarmPower plant9 MWOperating1.2 km
Abbots Ripton Solar FarmPower plant24.7 MWOperating4.0 km
Bury Grid 11kVSubstation——7.2 km
Bury Primary 11kVSubstation——7.2 km
Data center, England (OSM way 87850427)Data center——16 km
Positive ParkData center——27 km
West Cambridge Data CentreData center——30 km

Holder, grid operator and place

More from Anesco

Other grid connections in England

All 4837 grid connections in England, United Kingdom