Grid connection · Scotland, United Kingdom

Shire End 20MW PV grid connection

Shire End 20MW PV grid connection is a planned grid connection in Scotland, United Kingdom, with 20 MW of capacity, connected by Scottish Hydro Electric.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceSHIRE END 20MW PV grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Abernethy Grid)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toShire-End Farm (matched by shared name+coordinates+technology+capacity, 0.24 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Attached toAbernethy Primary (via a primary substation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity20 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologySolarSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro ElectricSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date16 Feb 2023SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date31 Oct 2033 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates56.2694, -3.4611SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Permit granted: Shire-End Farm (planning authority Perth and Kinross, reference 14/02077/FLL)
  2. Permit applied for: Shire-End Farm (planning authority Perth and Kinross, reference 14/02077/FLL)

How it compares

Shire End 20MW PV grid connection is the 556th-largest of 1,192 grid connections in Scotland and the 1,645th-largest of 3,903 in the United Kingdom by capacity; its 20 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland556th of 1,19288,894 MW<0.1%
United Kingdom1,645th of 3,903446,745 MW<0.1%
All grid connections in our data5,244th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 337 power plants (85 operating, 1,237 MW), 57 substations and 8 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Shire-End FarmPower plant17 MWCancelled0.2 km
Milnathort Community Wind ClusterPower plant2.4 MWCancelled1.0 km
TillyriePower plant4.2 MWCancelled1.4 km
Milnathort PrimarySubstation——5.0 km
Bridge of Earn PrimarySubstation——9.1 km
Forteviot PrimarySubstation——10.0 km
Edinburgh SC-3Data center——38 km
Pulsant Edinburgh SC-1Data center——39 km
Pulsant Edinburgh South Gyle SC-1Data center——39 km

Grid operator and place

More from Scottish Hydro Electric

Other grid connections in Scotland

All 1192 grid connections in Scotland, United Kingdom

Data on this page