Grid connection · Scotland, United Kingdom

Perwinnes grid connection

Perwinnes grid connection is a planned grid connection in Scotland, United Kingdom, with 48 MW of capacity, held by Roadnight Taylor Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourcePERWINNES grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Dyce Grid)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderRoadnight Taylor LtdSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toDyce GSP (via a primary substation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity48 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologySolarSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyBattery storageSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date1 Feb 2022SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date15 Jan 2027 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates57.2197, -2.1835SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

Perwinnes grid connection is the 309th-largest of 1,192 grid connections in Scotland and the 1,036th-largest of 3,903 in the United Kingdom by capacity; its 48 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland309th of 1,19288,894 MW<0.1%
United Kingdom1,036th of 3,903446,745 MW<0.1%
All grid connections in our data4,422nd of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 218 power plants (68 operating, 667 MW), 75 substations and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Dyce GSPSubstation——0.6 km
Dyce Energy Storage, Raiths Industrial Estate - Battery FacilityPower plant50 MWOperating1.1 km
Aryburn Farm, Dyce - Battery StoragePower plant49.9 MWCancelled1.2 km
Dyce North PrimarySubstation——1.6 km
Farburn Place - Battery Energy Storage FacilityPower plant30 MWUnder construction1.8 km
Stoneywood (T3) PrimarySubstation——3.3 km
BrightsolidData center——7.6 km

Holder, grid operator and place

More from Roadnight Taylor Ltd

Other grid connections in Scotland

All 1192 grid connections in Scotland, United Kingdom

Data on this page